Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2022, 08:22 AM
  • 01 0542_01 0541A_03212022_012917.mp4

Date
03/21/2022
W/O
941472
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00206
PipeID
P18915
Time
1:22 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10013
Sewer Name
01 CROCKETT BOULEVARD-GLEN AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_941472_TV01232_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
01 0542
Downstream MH
01 0541A
Dir. of Survey
Downstream
Length Surveyed
44 ft.
Total Length
44 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
10
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 01 0542 to 01 0541A
MH: 01 0542MH: 01 0541Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 05420 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES21.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS26.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start30 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"41.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish41.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish41.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish41.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish44 ft. AMH - Downstream Manhole, Survey Ends - 01 0541A44 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (6)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    15.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    26.8 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    44 ft. - General Observation - COCKROACHES IN MH

Observations (17)

DistanceCodeObservation
0MWL
26.8FM
0AMH01 0542
44AMH01 0541A
4.7SAP
41.5SAP
44MGOCOCKROACHES IN MH
15.6CM
21.9DSZDEBRIS
41.5DAGS
30TF
0MGOCOCKROACHES IN MH
41.5DSZ
0MGOCONNECTION AT MH 3 O'CLOCK
41.5FM
2DAGS
0MWM

Properties (7)

additional_info
630138032122001
custom_field_three
FRACTURES/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-21T01:22:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false