Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 4, 2022, 11:47 AM
  • 15 0896_15 0895_04042022_050116.mp4

Date
04/04/2022
W/O
947132
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00599
PipeID
P12690
Time
4:47 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10028
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
RFIR_WO_947132_TV15182_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0896
Downstream MH
15 0895
Dir. of Survey
Downstream
Length Surveyed
259.5 ft.
Total Length
259.5 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0896 to 15 0895
MH: 15 0896MH: 15 0895downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 08960 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start66.2 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"150.2 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"157.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"199.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"257.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish259.5 ft. AMH - Downstream Manhole, Survey Ends - 15 0895

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

    150.2 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

Observations (15)

DistanceCodeObservation
66.2TB
150.2TBI
257.8SAP
0AMH15 0896
199.4TBA
259.5AMH15 0895
2SAP
257.8FM
0MGOCONNECTION AT MH 9 O'CLOCK
0MWL
257.8DAGS
5.2FM
157.6TBA
0MWM
2DAGS

Properties (7)

additional_info
630138040422001
custom_field_three
MULTIPLE FRACTURES/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-04-04T04:47:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false