Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2021, 05:34 AM
  • 18 0670_18 0669_12062021_222300.mp4

Date
12/06/2021
W/O
921605
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00696
PipeID
P14519
Time
9:34 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9554
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_921605_TV18081_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
18 0670
Downstream MH
18 0669
Dir. of Survey
Downstream
Length Surveyed
342.7 ft.
Total Length
342.7 ft.
Structural Index
4
Structural Quick
4K33
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
255
Pipe schematic from manhole 18 0670 to 18 0669
MH: 18 0670MH: 18 0669downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 06700 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.3 ft. MGO - General Observation - HEAVY STEAM10.1 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES20.7 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES, Start36.1 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES, Finish36.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start119.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"220.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"322.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"342.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish342.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0669

Observation photos (3)

  • Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    10.1 ft. - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES, Start

    20.7 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    36.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
124.5TF
36.1FL
20.7FL
220.8TFC
2.3MGOHEAVY STEAM
0AMH18 0670
0MGOCONNECTION AT THE MH 9 OC'LOCK
36.1FM
0MWL
342.7FM
119.1TFC
10.1CL
342.7AMH18 0669
0MWM
317.6TFC
322.9TF
226.3TF

Properties (7)

additional_info
630074120621201
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-12-06T21:34:54-08:00
documentation
PROPIPE
is_lateral_inspection
false