Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2021, 07:56 AM
  • 18 0657_18 0656_12072021_001400.mp4

Date
12/06/2021
W/O
921605
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00696
PipeID
P14506
Time
11:56 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9554
Sewer Name
18 PHOEBE AVENUE TRUNK
City
LA MIRADA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_921605_TV18081_NOV2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0657
Downstream MH
18 0656
Dir. of Survey
Downstream
Length Surveyed
323.8 ft.
Total Length
323.8 ft.
Structural Index
4
Structural Quick
4J22
Structural Rating
232
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
232
Pipe schematic from manhole 18 0657 to 18 0656
MH: 18 0657MH: 18 0656downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 06572.2 ft. CL - Crack Longitudinal, at 05 o'clock, within 8 inches of joint: YES6.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"11.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"18.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start71.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish77.4 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES92.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start104.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"110 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"323.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0656323.8 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK323.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Crack Longitudinal, at 05 o'clock, within 8 inches of joint: YES

    2.2 ft. - Crack Longitudinal, at 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    18.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    77.4 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    92.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    205.5 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (18)

DistanceCodeObservation
110TFC
0MWL
323.8AMH18 0656
77.4CL
205.5TB
210.5TFC
2.2CL
0MWM
11.7TF
92.7FM
323.8MGOCONNECTION AT THE MH 9 OC'LOCK
323.8FM
71.9FM
6.8TF
18.7FM
205.5TFC
0AMH18 0657
104.5TFC

Properties (7)

additional_info
630074120621201
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2021-12-06T23:56:05-08:00
documentation
PROPIPE
is_lateral_inspection
false