Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2022, 10:13 AM
  • 04 0030_04 0029_03212022_032206.mp4

Date
03/21/2022
W/O
941962
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00416
PipeID
P11758
Time
3:13 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10014
Sewer Name
04 SHERMAN RELIEF TRUNK
City
WEST HOLLYWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
01
Purpose
Routine Assessment
Project
WO_941962_TV04030_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
04 0030
Downstream MH
04 0029
Dir. of Survey
Downstream
Length Surveyed
128.3 ft.
Total Length
128.3 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 04 0030 to 04 0029
MH: 04 0030MH: 04 0029downstream0 ft. AMH - Upstream Manhole, Survey Begins - 04 00300 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MH2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MMC - Material Change, Concrete pipe (non-reinfored)93.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start93.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish126.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish126.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish128.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK128.3 ft. MGO - General Observation - COCKROACHES IN MH128.3 ft. AMH - Downstream Manhole, Survey Ends - 01 0029

Observation photos (6)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    2 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    93.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    128.3 ft. - General Observation - COCKROACHES IN MH

Observations (15)

DistanceCodeObservation
0AMH04 0030
0MWL
0MWM
2DAGS
0MGOCONNECTION AT MH 3 O'CLOCK
93.7SAP
126.7SAP
126.7DAGS
128.3MGOCONNECTION AT MH 9 O'CLOCK
2SAV
2MMC
93.7SAV
0MGOCOCKROACHES IN MH
128.3MGOCOCKROACHES IN MH
128.3AMH01 0029

Properties (7)

additional_info
630138032122002
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-03-21T03:13:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false