Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 22, 2022, 10:19 AM
  • 15 1116_15 1115_03222022_034700.mp4

Date
03/22/2022
W/O
941498
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00615
PipeID
P12876
Time
3:19 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9933
Sewer Name
15 MERCED TRUNK, SECTION 2
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
RFIR_WO_941498_TV15248_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 1116
Downstream MH
15 1115
Dir. of Survey
Downstream
Length Surveyed
296.3 ft.
Total Length
296.3 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 15 1116 to 15 1115
MH: 15 1116MH: 15 1115downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 11160 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area20.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"87 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"122.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"228.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"261 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start261 ft. MMC - Material Change, Concrete pipe (non-reinfored)276.1 ft. MMC - Material Change, Vitrified clay pipe276.1 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish277.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"296.3 ft. AMH - Downstream Manhole, Survey Ends - 15 1115296.3 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (5)

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    87 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    149.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    261 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    261 ft. - Material Change, Concrete pipe (non-reinfored)

  • Material Change, Vitrified clay pipe

    276.1 ft. - Material Change, Vitrified clay pipe

Observations (20)

DistanceCodeObservation
170.9TFC
276.1MMC
228.7TFC
20.2TFC
0AMH15 1116
149.8TB
125.9TFC
87TB
277.4TF
296.3AMH15 1115
261SAV
0MWL
261MMC
74.1TFC
183.3TFC
122.5TFC
276.1SAV
296.3MGOCONNECTION AT THE MH 9 OC'LOCK
71TF
0MWM

Properties (7)

additional_info
630074032122204
custom_field_three
aggregate visible
custom_field_two
3
customer
1
datetime
2022-03-22T03:19:55-07:00
documentation
PROPIPE
is_lateral_inspection
false