Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2022, 07:17 AM
  • 18 0137_18 0136_03152022_002718.mp4

Date
03/15/2022
W/O
941308
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00695
PipeID
P13958
Time
12:17 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9920
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
29
Purpose
Routine Assessment
Project
WO_941308_TV18043_MAR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
18 0137
Downstream MH
18 0136
Dir. of Survey
Downstream
Length Surveyed
298.7 ft.
Total Length
298.7 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
174
Pipe schematic from manhole 18 0137 to 18 0136
MH: 18 0137MH: 18 0136downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01372.6 ft. MGO - General Observation - MAG COAT10.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0136298.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish298.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
10.2SAV
0MWL
0MWM
2.6MGOMAG COAT
298.7AMH18 0136
0AMH18 0137
298.7SAV
298.7MGOCONNECTION AT THE MH 9 OC'LOCK

Properties (7)

additional_info
630074031422201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
4
customer
1
datetime
2022-03-15T00:17:07-07:00
documentation
PROPIPE
is_lateral_inspection
false