C 0384_C 0383_03152022_011937.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - MAG COATING
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
8 ft. - Alignment Left, 15 %
13.9 ft. - Infiltration Stain, from 12 to 04 o'clock, within 8 inches of joint: YES
30 ft. - Alignment Right, 10 %
121.3 ft. - Infiltration Stain, from 02 to 04 o'clock, within 8 inches of joint: YES
184.1 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
226 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
265.3 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
265.3 ft. - Infiltration Stain, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 275.9 | SAP | — |
| 0 | AMH | C 0383 |
| 2 | SSS | — |
| 8 | LL | — |
| 275.9 | SSS | — |
| 2 | MGO | MAG COATING |
| 2 | SAP | — |
| 30 | LR | — |
| 13.9 | IS | — |
| 275.9 | AMH | C 0384 |
| 2 | SRV | — |
| 184.1 | IG | — |
| 121.3 | IS | — |
| 265.3 | ID | — |
| 0 | MWL | — |
| 226 | ID | — |
| 265.3 | SRV | — |
| 265.3 | IS | — |