C 0383_C 0382_03152022_014853.mp4
2 ft. - General Observation - MAG COATING
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
18.8 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
18.8 ft. - Infiltration Stain, from 09 to 04 o'clock, within 8 inches of joint: YES
26.8 ft. - Infiltration Gusher, at 11 o'clock, within 8 inches of joint: YES
41.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
52.3 ft. - Infiltration Stain, from 08 to 10 o'clock, within 8 inches of joint: YES
214.2 ft. - Infiltration Stain, from 08 to 11 o'clock, within 8 inches of joint: YES
235.9 ft. - Infiltration Gusher, at 04 o'clock, within 8 inches of joint: YES
293.1 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
342.9 ft. - Infiltration Stain, from 10 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 361.1 | SSS | — |
| 361.1 | SAP | — |
| 2 | MGO | MAG COATING |
| 0 | AMH | C 0383 |
| 361.1 | AMH | C 0382 |
| 2 | SSS | — |
| 18.8 | IG | — |
| 361.1 | MGO | GIS CALLS FOR 360' |
| 7 | SAP | — |
| 0 | MWM | — |
| 361.1 | SRV | — |
| 293.1 | ID | — |
| 361.1 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 52.3 | IS | — |
| 18.8 | IS | — |
| 235.9 | IG | — |
| 214.2 | IS | — |
| 342.9 | IS | — |
| 0 | MWL | — |
| 41.1 | SRV | — |
| 26.8 | IG | — |