C 0382_C 0381_03152022_023347.mp4
2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.4 ft. - General Observation - MAG COATING
2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
54.6 ft. - Infiltration Gusher, at 08 o'clock, within 8 inches of joint: YES
586.6 ft. - Infiltration Stain, from 12 to 04 o'clock, within 8 inches of joint: YES
586.6 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
603.2 ft. - Alignment Left, 25 %
619.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 12"
629.1 ft. - Infiltration Dripper, from 11 to 02 o'clock, within 8 inches of joint: YES
635.8 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 656.8 | AMH | C 0381 |
| 629.1 | ID | — |
| 0 | MWL | — |
| 54.6 | IG | — |
| 2.4 | SSS | — |
| 656.8 | SRV | — |
| 603.2 | LL | — |
| 656.8 | SAP | — |
| 6 | SRV | — |
| 0 | MWM | — |
| 586.6 | IS | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 635.8 | DAE | — |
| 656.8 | SSS | — |
| 2.4 | MGO | MAG COATING |
| 586.6 | ID | — |
| 2.4 | SAP | — |
| 619.3 | TBA | — |
| 0 | AMH | C 0382 |