Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 7, 2022, 11:28 AM
  • 20 0156_20 0155_03072022_044041.mp4

Date
03/07/2022
W/O
941504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19079
Time
3:28 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9898
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_941504_TV20029_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0155
Downstream MH
20 0156
Dir. of Survey
Upstream
Length Surveyed
334.3 ft.
Total Length
334.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L11
O&M Rating
135
Overall Index
2
Overall Quick
Overall Rating
465
Pipe schematic from manhole 20 0155 to 20 0156
MH: 20 0155MH: 20 0156upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01562.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"29.8 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"30.3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES32.3 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR - 5% ROOTS47.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"201 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"273.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"301.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"321.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"332.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start332.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start332.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.3 ft. MWM - Water Mark, 25 %of cross sectional area334.3 ft. MWL - Water Level, 20 %of cross sectional area334.3 ft. AMH - Downstream Manhole, Survey Begins - 20 0155

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
331.8SAP
334.3AMH20 0156
331SSS
233.4TFC
185.5TFC
0MWM
257.3TFC
302RFJ5% ROOTS
13TFC
304.5TBA
2SAP
0MWL
331.8DAGS
109.7TFC
2DAGS
32.9TFC
161.1TFC
133.3TFC
304DAGS
208.9TFC
0AMH20 0155
61TFC
2SSS
85.4TFC
286.4TFC
309.8TFC

Properties (7)

additional_info
630138030722001
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-03-07T03:28:08-08:00
documentation
PRO PIPE
is_lateral_inspection
false