Wastewater/Activity/PacpInspection/1.0Mar 8, 2022, 07:27 AM
  • 20 0152_20 0151_03082022_004321.mp4

Date
03/07/2022
W/O
941504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19075
Time
11:27 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9899
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_941504_TV20029_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0152
Downstream MH
20 0151
Dir. of Survey
Downstream
Length Surveyed
310 ft.
Total Length
310 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
183
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
305
Pipe schematic from manhole 20 0152 to 20 0151
MH: 20 0152MH: 20 0151downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 01520 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"77.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"105.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"130.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"177.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"205.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"229.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"301.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish307.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310 ft. AMH - Downstream Manhole, Survey Ends - 20 0151

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
130.1TFC
301.4TFC
77.9TFC
253.5TFC
2SAP
205.3TFC
177.6TFC
310AMH20 0151
153.5TFC
307.7DAGS
2DAGS
0AMH20 0152
0MWL
277.7TFC
105.9TFC
53.9TFC
307.7SAP
0MWM
229.6TF
30.2TFC

Properties (7)

additional_info
630138030722201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-03-07T23:27:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false