Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2022, 09:12 AM
  • 20 0146_20 0145_03032022_031449.mp4

Date
03/03/2022
W/O
941504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19069
Time
1:12 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9896
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_941504_TV20029_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0146
Downstream MH
20 0145
Dir. of Survey
Downstream
Length Surveyed
391.1 ft.
Total Length
391.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
2
O&M Quick
2O00
O&M Rating
156
Overall Index
2
Overall Quick
Overall Rating
541
Pipe schematic from manhole 20 0146 to 20 0145
MH: 20 0146MH: 20 0145downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 01462 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"121.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"240.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"299 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"354.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"382.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS389 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish389 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish389 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish391.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE391.1 ft. AMH - Downstream Manhole, Survey Ends - 20 0145

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
382.9DSZDEBRIS
354.7TFC
240.1TFC
0MWM
391.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
2DAGS
93.8TFC
389SAP
180.6TFC
2SAP
0MWL
149.4TFC
2SSS
121.5TFC
391.1AMH20 0145
299TFC
62.4TFC
0AMH20 0146
389DAGS
389SSS

Properties (7)

additional_info
630138030222202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-03T01:12:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false