Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2022, 09:25 AM
  • 32 1002A_32 1286_03152022_023613.mp4

Date
03/15/2022
W/O
941500
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19448
Time
2:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10009
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_941500_TV32049_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1002A
Downstream MH
32 1286
Dir. of Survey
Downstream
Length Surveyed
224.1 ft.
Total Length
224.1 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 32 1002A to 32 1286
MH: 32 1002AMH: 32 1286downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 1002A0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start94.5 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES223.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish224.1 ft. AMH - Downstream Manhole, Survey Ends - 32 1286224.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

    94.5 ft. - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
2SSS
223.5SSS
223.5SAP
94.5RFJ
0MWM
224.1AMH32 1286
224.1MGOCONNECTION AT MH 9 O'CLOCK
223.5DAGS
0AMH32 1002A
2DAGS
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
2SAP

Properties (7)

additional_info
630138031422202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-15T02:25:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false