Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 14, 2022, 11:12 AM
  • 05 1093_05 1092_03142022_043135.mp4

Date
03/14/2022
W/O
941470
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00488
PipeID
P06327
Time
4:12 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9960
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 1
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_941470_TV05328_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
05 1093
Downstream MH
05 1092
Dir. of Survey
Downstream
Length Surveyed
322.8 ft.
Total Length
322.8 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
181
O&M Index
2
O&M Quick
412L
O&M Rating
132
Overall Index
3
Overall Quick
Overall Rating
313
Pipe schematic from manhole 05 1093 to 05 1092
MH: 05 1093MH: 05 1092downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 19032 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"17.1 ft. FM - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES32.4 ft. CM - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES38.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start100.3 ft. FS - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES104 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"207.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"322.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.1 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK322.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.8 ft. AMH - Downstream Manhole, Survey Ends - 05 1092

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

    17.1 ft. - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    32.4 ft. - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    38.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

    100.3 ft. - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
0MWL
100.3FS
207.5TF
322.1DAGS
322.1MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
0MWM
2DAGS
32.4CM
0AMH05 1903
17.1FM
322.1CM
6.1TF
322.8AMH05 1092
104TF
38.8CM

Properties (7)

additional_info
630098031422003
custom_field_three
CRACKS, FRACTURES
custom_field_two
2
customer
1
datetime
2022-03-14T04:12:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false