Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2022, 09:40 AM
  • B 0204_B 0203_03172022_032454.mp4

Date
03/17/2022
W/O
941505
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00076
PipeID
P08701
Time
2:40 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9924
Sewer Name
B JOINT OUTFALL B - UNIT 1D RELIEF
City
PICO RIVERA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_941505_TV02357_MAR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
45 in.
Width
126 in.
Upstream MH
B 0204
Downstream MH
B 0203
Dir. of Survey
Downstream
Length Surveyed
732.6 ft.
Total Length
732.6 ft.
Structural Index
3
Structural Quick
583\
Structural Rating
765
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
765
Pipe schematic from manhole B 0204 to B 0203
MH: B 0204MH: B 0203downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 02040 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 2 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.3 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish228.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"332.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"429.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"725.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish729.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish732.6 ft. AMH - Downstream Manhole, Survey Ends - B 0203

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
732.6AMHB 0203
228.7TFC
2.1SRV
0AMHB 0204
725.9SAP
2.1SSS
2SAP
0MWM
729.4SSS
429.4TF
42.3SRV
332.6TF
0MWL
0MGOCONNECTION AT MH 2 O'CLOCK

Properties (7)

additional_info
630098031622203
custom_field_three
AGGREGATE PROJECTING REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2022-03-17T02:40:17-07:00
documentation
PROPIPE
is_lateral_inspection
false