Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2022, 08:05 AM
  • 05 1294_05 1293_03172022_013002.mp4

Date
03/17/2022
W/O
941475
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00453
PipeID
P06507
Time
1:05 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9923
Sewer Name
05 GRAMERCY PLACE TRUNK, SECTION 1
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_941475_TV05181_MAR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
10 in.
Upstream MH
05 1294
Downstream MH
05 1293
Dir. of Survey
Downstream
Length Surveyed
459.9 ft.
Total Length
459.9 ft.
Structural Index
3
Structural Quick
5P3Q
Structural Rating
890
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
890
Pipe schematic from manhole 05 1294 to 05 1293
MH: 05 1294MH: 05 1293downstream0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 12940 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.9 ft. MGO - General Observation - MAG COATING18.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start453.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish456.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish456.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish459.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1293

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    18.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MGOCONNECTION AT MH 6 O'CLOCK
0MGOCONNECTION AT MH 3 O'CLOCK
5.9MGOMAG COATING
453.9SRV
456.9SAP
0MWM
18.5SRV
2SSS
0AMH05 1294
459.9AMH05 1293
456.3SSS
0MWL
2SAP

Properties (7)

additional_info
630098031622202
custom_field_three
aggregate projecting/spalling
custom_field_two
2
customer
1
datetime
2022-03-17T01:05:06-07:00
documentation
PROPIPE
is_lateral_inspection
false