Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 17, 2022, 08:25 AM
  • 17 0068_17 0067_02172022_004225.mp4

Date
02/17/2022
W/O
936263
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00668
PipeID
P13787
Time
12:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9874
Sewer Name
17 DISTRICT #17 MAIN TRUNK
City
ALTADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 17
Page No.
04
Purpose
Routine Assessment
Project
WO_936263_TV17011_FEB2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
17 0068
Downstream MH
17 0067
Dir. of Survey
Downstream
Length Surveyed
371 ft.
Total Length
371 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
365
O&M Index
2
O&M Quick
2R00
O&M Rating
194
Overall Index
2
Overall Quick
Overall Rating
559
Pipe schematic from manhole 17 0068 to 17 0067
MH: 17 0068MH: 17 0067downstream0 ft. MGO - General Observation - ROACHES0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 17 00682 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.9 ft. MGO - General Observation - 50% MAG COAT34.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN61.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN85.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN100.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN123.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN222.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"228.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN247.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS252.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN261.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN280.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN316.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN328.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"365.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN368 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish369.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish369.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish369.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish371 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE371 ft. AMH - Downstream Manhole, Survey Ends - 17 0067371 ft. MGO - General Observation - ROACHES

Observation photos (5)

  • General Observation - ROACHES

    0 ft. - General Observation - ROACHES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 50% MAG COAT

    6.9 ft. - General Observation - 50% MAG COAT

  • General Observation - ROACHES

    371 ft. - General Observation - ROACHES

Observations (30)

DistanceCodeObservation
0MGOROACHES
2SSS
100.8TFOPEN
61.9TFOPEN
371MGOCONN @ MH 9 O'CLOCK/ACTIVE
228.5TFOPEN
85.5TFOPEN
328.4TFC
3.2SAP
34.1TFOPEN
2DAGS
365.5TFOPEN
369.1DSZ
369.2DAGS
0MWL
280.1TFAOPEN
182.6TFOPEN
261.6TFOPEN
0MWM
371AMH17 0067
368SSS
6.9MGO50% MAG COAT
0AMH17 0068
369.2SAP
316.3TFAOPEN
123.3TFA
252.8TBAOPEN
247.5DSZDEBRIS
222.2TFC
371MGOROACHES

Properties (7)

additional_info
630074021622202
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-02-17T00:25:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false