Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2022, 08:09 AM
  • 18 0417_18 0416_03022022_012319.mp4

Date
03/02/2022
W/O
941501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00699
PipeID
P14252
Time
12:09 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9893
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_941501_TV18173_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Square
Height
18 in.
Width
18 in.
Upstream MH
18 0417
Downstream MH
18 0416
Dir. of Survey
Downstream
Length Surveyed
327.9 ft.
Total Length
327.9 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
328
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
332
Pipe schematic from manhole 18 0417 to 18 0416
MH: 18 0417MH: 18 0416downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04170 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT57.9 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"120.3 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"186.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"264.9 ft. FS - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES282.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"327.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.9 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED327.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0416

Observation photos (8)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

    57.9 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

    120.3 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"

    186.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"

  • Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES

    264.9 ft. - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"

    282.4 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 8"

Observations (15)

DistanceCodeObservation
2SAV
327.5SAV
327.9MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
327.5SSS
0MWL
264.9FS
0AMH18 0417
2SSS
2MGOMAG COAT
327.9AMH18 0416
282.4TB
186.2TB
0MWM
57.9TB
120.3TB

Properties (7)

additional_info
630074030122203
custom_field_three
MAG COAT, AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2022-03-02T00:09:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false