Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2022, 07:37 AM
  • 18 0405_18 0404_03032022_005258.mp4

Date
03/02/2022
W/O
941501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00699
PipeID
P14240
Time
11:37 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9800
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_941501_TV18173_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0405
Downstream MH
18 0404
Dir. of Survey
Downstream
Length Surveyed
412.8 ft.
Total Length
412.8 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
2
O&M Quick
3111
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 18 0405 to 18 0404
MH: 18 0405MH: 18 0404downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 04052.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start70.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"218.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 8"257.1 ft. RFJ - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES257.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES269.3 ft. RMJ - Roots Medium Joint, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YESR369.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 8"407.5 ft. FS - Fracture Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES412.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish412.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish412.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0404

Observation photos (8)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.3 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

    70.2 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 8"

  • Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

    257.1 ft. - Roots Fine Joint, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    257.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Roots Medium Joint, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YESR

    269.3 ft. - Roots Medium Joint, from 09 to 03 o'clock, 15 %, within 8 inches of joint: YESR

  • Fracture Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES

    407.5 ft. - Fracture Spiral, from 05 to 06 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
218.8TF
2.3SAV
412.8SAV
269.3RMJ
407.5FS
0MWL
70.2TB
257.1RFJ
0MWM
257.7CM
412.8SSS
2.3MGOMAG COAT
0AMH18 0405
412.8AMH18 0404
2.3SSS
369.7TF

Properties (7)

additional_info
63007403022202
custom_field_three
MAG COAT. AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2022-03-02T23:37:33-08:00
documentation
PRO PIPE
is_lateral_inspection
false