Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2022, 09:34 AM
  • 18 0401A_18 0401_03032022_024133.mp4

Date
03/03/2022
W/O
941501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00699
PipeID
P14236
Time
1:34 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9800
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_941501_TV18173_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0401A
Downstream MH
18 0401
Dir. of Survey
Downstream
Length Surveyed
78.2 ft.
Total Length
78.2 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
75
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
75
Pipe schematic from manhole 18 0401A to 18 0401
MH: 18 0401AMH: 18 0401downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 0401A2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.1 ft. MGO - General Observation - MAG COAT55.5 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"78.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish78.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish78.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0401

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    15.1 ft. - General Observation - MAG COAT

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    55.5 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

Observations (11)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 9 OC'LOCK
78.2SAV
2SAV
0MWM
55.5TB
15.1MGOMAG COAT
2SSS
78.2SSS
0MWL
78.2AMH18 0401
0AMH18 0401A

Properties (7)

additional_info
63007403022202
custom_field_three
MAG COAT. AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2022-03-03T01:34:47-08:00
documentation
PRO PIPE
is_lateral_inspection
false