Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 18, 2022, 10:56 AM
  • 29 0345_29 0322_02182022_042014.mp4

Date
02/18/2022
W/O
941464
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01017
PipeID
P24340
Time
2:56 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9741
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_941464_TV29105_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0345
Downstream MH
29 0322
Dir. of Survey
Downstream
Length Surveyed
490 ft.
Total Length
490 ft.
Structural Index
3
Structural Quick
3S00
Structural Rating
294
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
294
Pipe schematic from manhole 29 0345 to 29 0322
MH: 29 0345MH: 29 0322downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 03453.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish142.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"258 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"360.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"482.1 ft. FS - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES490 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish490 ft. AMH - Downstream Manhole, Survey Ends - 29 0322490 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    482.1 ft. - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
490SAP
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
13SAP
360.2TF
490AMH29 0322
3.1SAV
490MGOCONNECTION AT THE MH 3 OC'LOCK
142.9TF
13SAV
258TF
0MWM
0AMH29 0345
482.1FS

Properties (7)

additional_info
630074021722202
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-02-18T02:56:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false