Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2022, 06:13 AM
  • 05 0704_05 0703_03032022_233600.mp4

Date
03/03/2022
W/O
941499
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00523
PipeID
P05936
Time
10:13 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9786
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #2
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_941499_TV05208_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
10 in.
Upstream MH
05 0704
Downstream MH
05 0703
Dir. of Survey
Downstream
Length Surveyed
143.8 ft.
Total Length
143.8 ft.
Structural Index
3
Structural Quick
524B
Structural Rating
143
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
3
Overall Quick
Overall Rating
201
Pipe schematic from manhole 05 0704 to 05 0703
MH: 05 0704MH: 05 0703downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 07040 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.9 ft. BSV - Broken Soil Visible, from 02 to 10 o'clock, within 8 inches of joint: YES8 ft. HSV - Hole Soil Visible, from 03 to 05 o'clock, within 8 inches of joint: YES11.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24 ft. MGO - General Observation - STAINING26.4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start37.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish37.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start42.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES45.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES46.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"53.2 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish71.4 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES76.6 ft. FM - Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES77.5 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start83.6 ft. FM - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES95.4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish95.5 ft. FM - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES99.1 ft. FM - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES99.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"102.9 ft. FM - Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES106.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: NO128.4 ft. MWL - Water Level, 20 %of cross sectional area142.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish142.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish143.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK143.8 ft. AMH - Downstream Manhole, Survey Ends - 05 0703

Observation photos (16)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Broken Soil Visible, from 02 to 10 o'clock, within 8 inches of joint: YES

    7.9 ft. - Broken Soil Visible, from 02 to 10 o'clock, within 8 inches of joint: YES

  • Hole Soil Visible, from 03 to 05 o'clock, within 8 inches of joint: YES

    8 ft. - Hole Soil Visible, from 03 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    26.4 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    42.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    45.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    71.4 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES

    76.6 ft. - Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    77.5 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

    83.6 ft. - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    95.5 ft. - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

    99.1 ft. - Fracture Multiple, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

    102.9 ft. - Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: NO

    106.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: NO

Observations (31)

DistanceCodeObservation
99.1FM
142.5CM
95.4MWLS
102.9FM
142.5DAGS
99.2TFC
76.6FM
37.8FM
0MWM
0AMH05 0704
0MWL
7.9BSV
45.9FM
77.5MWLS
83.6FM
71.4FM
106.7DAGS
26.4MWLS
42.4FM
8HSV
11.2FM
2.1DAGS
143.8MGOCONNECTION AT MH 3 O'CLOCK
95.5FM
37.8CM
128.4MWL
0MGOCONNECTION AT MH 9 O'CLOCK
53.2MWLS
24MGOSTAINING
46.4TF
143.8AMH05 0703

Properties (7)

additional_info
630074030322201
custom_field_three
BROKEN/HOLE, FRACTURES
custom_field_two
1
customer
1
datetime
2022-03-03T22:13:52-08:00
documentation
PROPIPE
is_lateral_inspection
false