Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 4, 2022, 07:21 AM
  • 05 0700_05 0699_03042022_005725.mp4

Date
03/03/2022
W/O
941449
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00523
PipeID
P05932
Time
11:21 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9786
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #2
City
INGLEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_941499_TV05208_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
10 in.
Upstream MH
05 0700
Downstream MH
05 0699
Dir. of Survey
Downstream
Length Surveyed
266.2 ft.
Total Length
266.2 ft.
Structural Index
3
Structural Quick
5148
Structural Rating
213
O&M Index
2
O&M Quick
312K
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
361
Pipe schematic from manhole 05 0700 to 05 0699
MH: 05 0700MH: 05 0699downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 07000 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.1 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES20.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start21.6 ft. MWL - Water Level, 45 %of cross sectional area - DUE TO BLOCKAGE AHEAD26.5 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES33.3 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start33.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish52.2 ft. CM - Crack Multiple, from 12 to 03 o'clock, within 8 inches of joint: YES52.2 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish53.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"63.9 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start69.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start69.3 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start88.4 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES90.7 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start99.3 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish99.3 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish101.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"103.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES104 ft. H - Hole, from 09 to 11 o'clock, within 8 inches of joint: NO104.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 01 to 10 o'clock, , within 8 inches of joint: NO105.6 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"112.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES118.4 ft. FS - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES127.4 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start133.9 ft. FM - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES149 ft. FM - Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES152.1 ft. FM - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES153.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"168.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish168.5 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start168.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Change177.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Change177.4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish201.1 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start204.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"209.4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish212.4 ft. FM - Fracture Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES224.4 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Start228 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES232.7 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start243 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish243 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area, Finish252.3 ft. FS - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES253.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"264.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish264.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish264.2 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Finish266.2 ft. AMH - Downstream Manhole, Survey Ends - 05 0699

Observation photos (29)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

    6.1 ft. - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    20.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    26.5 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    33.3 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Crack Multiple, from 12 to 03 o'clock, within 8 inches of joint: YES

    52.2 ft. - Crack Multiple, from 12 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    63.9 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    69.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    69.3 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    88.4 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    90.7 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    103.2 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Hole, from 09 to 11 o'clock, within 8 inches of joint: NO

    104 ft. - Hole, from 09 to 11 o'clock, within 8 inches of joint: NO

  • Deposits Attached Grease, 10 %of cross sectional area, from 01 to 10 o'clock,  , within 8 inches of joint: NO

    104.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 01 to 10 o'clock, , within 8 inches of joint: NO

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    112.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    118.4 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

    127.4 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start

  • Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    133.9 ft. - Fracture Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

    149 ft. - Fracture Multiple, from 10 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

    152.1 ft. - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    168.5 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Change

    168.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Change

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Change

    177.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Change

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    201.1 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES

    212.4 ft. - Fracture Multiple, from 08 to 10 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 20 %of cross sectional area, Start

    224.4 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    228 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    232.7 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

    252.3 ft. - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

Observations (52)

DistanceCodeObservation
52.2CM
26.5DAGS
243MWLS
266.2AMH05 0699
33.3MWLS
252.3FS
177.4DAGS
105.6TB
168.5DAGS
0AMH05 0700
243MWLS
224.4MWLS
104.8DAGS
20.8DAGS
101.7TFC
209.4MWLS
253.6TFC
201.1MWLS
69.3DAGS
2DAGS
264.2DAGS
168.5MWLS
204.7TFC
99.3MWLS
21.6MWLDUE TO BLOCKAGE AHEAD
112.4FM
177.4MWLS
212.4FM
53.6TF
6.1FS
149FM
104H
153.9TFC
99.3MWLS
0MWM
0MWL
228FM
264.2CM
69.3MWLS
88.4FM
63.9CM
127.4RFJ
90.7MWLS
232.7MWLS
152.1FM
118.4FS
52.2MWLS
264.2RFJ
133.9FM
168.5DAGS
33.3DAGS
103.2FM

Properties (7)

additional_info
630074030322201
custom_field_three
HOLE, FRACTURES
custom_field_two
1
customer
1
datetime
2022-03-03T23:21:28-08:00
documentation
PROPIPE
is_lateral_inspection
false