Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2022, 05:31 AM
  • 18 1050_18 1049A_02282022_224423.mp4

Date
02/28/2022
W/O
941485
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00678
PipeID
P23534
Time
9:31 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9749
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 2A
City
WHIITIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_941485_TV18015_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1050
Downstream MH
18 1049A
Dir. of Survey
Downstream
Length Surveyed
116.5 ft.
Total Length
116.5 ft.
Structural Index
3
Structural Quick
3B21
Structural Rating
50
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
50
Pipe schematic from manhole 18 1050 to 18 1049A
MH: 18 1050MH: 18 1049Adownstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10500 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK5.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"9.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES19.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"23.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"23.8 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES42.4 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES48.5 ft. CM - Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES52.6 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start74.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"115.8 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK115.8 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish116.5 ft. MGO - General Observation - GIS MAPS CALL FOR 115'116.5 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK116.5 ft. AMH - Downstream Manhole, Survey Ends - 18 1049A

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    9.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    23.8 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    42.4 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES

    48.5 ft. - Crack Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    52.6 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
116.5MGOGIS MAPS CALL FOR 115'
5.1TF
52.6CM
9.7CM
23.8CM
74.2TFC
116.5MGOCONNECTION AT THE MH 3 OC'LOCK
0AMH18 1050
115.8MGOCONNECTION AT THE MH 9 OC'LOCK
23.1TFC
0MWL
48.5CM
42.4CS
0MGOCONNECTION AT THE MH 9 OC'LOCK
19.6TF
115.8CM
116.5AMH18 1049A

Properties (7)

additional_info
630074022822201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-28T21:31:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false