Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2022, 05:45 AM
  • 18 1049A_18 1049_02282022_225301.mp4

Date
02/28/2022
W/O
941485
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00678
PipeID
P14904
Time
9:45 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9749
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 2A
City
WHIITIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_941485_TV18015_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1049A
Downstream MH
18 1049
Dir. of Survey
Downstream
Length Surveyed
70.3 ft.
Total Length
70.3 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
42
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
42
Pipe schematic from manhole 18 1049A to 18 1049
MH: 18 1049AMH: 18 1049downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 1049A0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 15 %of cross sectional area4.7 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start8.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"37.5 ft. FS - Fracture Spiral, from 05 to 07 o'clock, within 8 inches of joint: YES42.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"59.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"70.3 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish70.3 ft. AMH - Downstream Manhole, Survey Ends - 18 104970.3 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED

Observation photos (2)

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 05 to 07 o'clock, within 8 inches of joint: YES

    37.5 ft. - Fracture Spiral, from 05 to 07 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
42.2TF
0AMH18 1049A
37.5FS
0MGOCONNECTION AT THE MH 9 OC'LOCK
70.3CM
70.3AMH18 1049
0MWM
70.3MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
4.7CM
59.8TFC
8.8TFC

Properties (7)

additional_info
630074022822201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-28T21:45:22-08:00
documentation
PRO PIPE
is_lateral_inspection
false