Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2022, 09:01 AM
  • 18 1042_18 1041_03012022_021515.mp4

Date
03/01/2022
W/O
941485
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00678
PipeID
P14896
Time
1:01 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9749
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 2A
City
WHIITIER
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_941485_TV18015_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
18 1042
Downstream MH
18 1041
Dir. of Survey
Downstream
Length Surveyed
227.6 ft.
Total Length
227.6 ft.
Structural Index
3
Structural Quick
3F21
Structural Rating
113
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
3
Overall Quick
Overall Rating
165
Pipe schematic from manhole 18 1042 to 18 1041
MH: 18 1042MH: 18 1041downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10420 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWM - Water Mark, 20 %of cross sectional area40.8 ft. CS - Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES41.9 ft. CM - Crack Multiple, from 04 to 07 o'clock, within 8 inches of joint: YES45.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"99.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start102.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"132.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"163.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"209.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"216.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"227.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish227.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227.6 ft. MGO - General Observation - GIS MAPS CALL FOR 226'227.6 ft. AMH - Downstream Manhole, Survey Ends - 18 1041

Observation photos (4)

  • Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

    40.8 ft. - Crack Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 04 to 07 o'clock, within 8 inches of joint: YES

    41.9 ft. - Crack Multiple, from 04 to 07 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    45.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    99.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
45.9CM
0MWL
102.3TF
227.6DAGS
40.8CS
41.9CM
216.5TF
0AMH18 1042
227.6CM
227.6MGOGIS MAPS CALL FOR 226'
132.9TF
227.6AMH18 1041
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MWM
75.4TF
99.2DAGS
163.7TFA
209.8TF

Properties (7)

additional_info
630074022822201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-03-01T01:01:12-08:00
documentation
PRO PIPE
is_lateral_inspection
false