Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 7, 2022, 10:57 AM
  • 18 1121_18 1120_03072022_041103.mp4

Date
03/07/2022
W/O
941506
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00711
PipeID
P14974
Time
2:57 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9913
Sewer Name
18 STAGE ROAD JUNCTION TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO941506_TV18190_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
18 1121
Downstream MH
18 1120
Dir. of Survey
Downstream
Length Surveyed
270.4 ft.
Total Length
270.4 ft.
Structural Index
3
Structural Quick
433I
Structural Rating
159
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
159
Pipe schematic from manhole 18 1121 to 18 1120
MH: 18 1121MH: 18 1120downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 11219 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.5 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"22.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"24.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start70.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"117 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"119.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"174.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"266.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK270.4 ft. AMH - Downstream Manhole, Survey Ends - 18 1120

Observation photos (4)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    16.5 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    24.3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

    117 ft. - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"

Observations (16)

DistanceCodeObservation
222.7TFC
24.3FM
119.6TFC
9FM
270.4MGOCONNECTION AT THE MH 9 OC'LOCK
70.8TFC
117TB
0MWL
270.4AMH18 1120
22.3TFC
0MWM
24.3CM
16.5TB
266.9CM
174.4TFC
0AMH18 1121

Properties (7)

additional_info
630074030722002
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2022-03-07T02:57:13-08:00
documentation
PROPIPE
is_lateral_inspection
false