Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2022, 05:42 AM
  • 18 1074_18 1073_03012022_225729.mp4

Date
03/01/2022
W/O
941497
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00682
PipeID
P14933
Time
9:42 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9891
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_941497_TV18185_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
18 1074
Downstream MH
18 1073
Dir. of Survey
Downstream
Length Surveyed
205.3 ft.
Total Length
205.3 ft.
Structural Index
3
Structural Quick
3G11
Structural Rating
124
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
124
Pipe schematic from manhole 18 1074 to 18 1073
MH: 18 1074MH: 18 1073downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 10745 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.1 ft. JOM - Joint Offset Medium34.1 ft. FS - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES77.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"152.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"205.3 ft. AMH - Downstream Manhole, Survey Ends - 18 1073205.3 ft. MGO - General Observation - GIS MAPS CALL FOR 205'205.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Offset Medium

    18.1 ft. - Joint Offset Medium

  • Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

    34.1 ft. - Fracture Spiral, from 04 to 06 o'clock, within 8 inches of joint: YES

Observations (12)

DistanceCodeObservation
0MWM
0MGOCONNECTION AT THE MH 3 OC'LOCK
77.5TF
34.1FS
18.1JOM
0MWL
205.3AMH18 1073
152.9TFA
0AMH18 1074
5CM
205.3MGOGIS MAPS CALL FOR 205'
205.3CM

Properties (7)

additional_info
630074030122201
custom_field_three
CRACKS, FRACTURES
custom_field_two
3
customer
1
datetime
2022-03-01T21:42:56-08:00
documentation
PRO PIPE
is_lateral_inspection
false