Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 15, 2022, 08:16 AM
  • J 0185_J 0184_02152022_002527.mp4

Date
02/15/2022
W/O
936261
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00055
PipeID
P11424
Time
12:16 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9736
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
SAN PEDRO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
47A
Purpose
Routine Assessment
Project
WO_936261_TV05161_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
J 0185
Downstream MH
J 0184
Dir. of Survey
Downstream
Length Surveyed
181.2 ft.
Total Length
181.2 ft.
Structural Index
2
Structural Quick
2F00
Structural Rating
72
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
73
Pipe schematic from manhole J 0185 to J 0184
MH: J 0185MH: J 0184downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 01850 ft. VZ - Vermin Other, quantity: -, within 8 inches of joint: NO, 4 - MICE NEAR TOP OF U/S MH STACK @ 12 O'CLOCK (QTY. APPROX.).2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT181.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish181.2 ft. AMH - Downstream Manhole, Survey Ends - J 0184

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (8)

DistanceCodeObservation
0MWL
0MWM
0AMHJ 0185
2SSS
181.2SSS
0VZMICE NEAR TOP OF U/S MH STACK @ 12 O'CLOCK (QTY. APPROX.).
2MGOMAG COAT
181.2AMHJ 0184

Properties (7)

additional_info
630074021422201
custom_field_three
SPALLING, MAG COAT
custom_field_two
3
customer
1
datetime
2022-02-15T00:16:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false