Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2022, 09:10 AM
  • J 0153_J 0495_02112022_011503.mp4

Date
02/11/2022
W/O
936261
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00055
PipeID
P26259
Time
1:10 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9734
Sewer Name
J JOINT OUTFALL J - UNIT 1C
City
RANCHO PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
40
Purpose
Routine Assessment
Project
WO_936261_TV05161_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
J 0153
Downstream MH
J 0495
Dir. of Survey
Downstream
Length Surveyed
27.7 ft.
Total Length
27.7 ft.
Structural Index
3
Structural Quick
3525
Structural Rating
25
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
25
Pipe schematic from manhole J 0153 to J 0495
MH: J 0153MH: J 0495downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 01530 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish27.7 ft. AMH - Downstream Manhole, Survey Ends - J 049527.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
27.7SAV
0MWL
2.1SSS
0AMHJ 0153
0MWM
2.1MGOMAG COAT
2.1SAV
27.7AMHJ 0495
27.7SSS

Properties (7)

additional_info
630074021022202
custom_field_three
MAG COAT, SPALLING
custom_field_two
3
customer
1
datetime
2022-02-11T01:10:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false