Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2022, 11:43 AM
  • 32 1239_32 1238_03082022_051810.mp4

Date
03/08/2022
W/O
941332
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00832
PipeID
P19708
Time
3:43 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9900
Sewer Name
32 BOUQUET CANYON TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
07
Purpose
Routine Assessment
Project
WO_941332_TV32007_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
32 1239
Downstream MH
32 1238
Dir. of Survey
Downstream
Length Surveyed
400 ft.
Total Length
400 ft.
Structural Index
2
Structural Quick
2O00
Structural Rating
158
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
316
Pipe schematic from manhole 32 1239 to 32 1238
MH: 32 1239MH: 32 1238downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12392 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MMC - Material Change, Vitrified clay pipe2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS47.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start47.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish69.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"225.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"373.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"376.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"395.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Finish398 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish400 ft. AMH - Downstream Manhole, Survey Ends - 32 1238

Observation photos (3)

  • Material Change, Vitrified clay pipe

    2 ft. - Material Change, Vitrified clay pipe

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - DEBRIS

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 12 o'clock,  , within 8 inches of joint: YES, Start

    47.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0MWM
400AMH32 1238
0MWL
299.5TFC
47.4DAE
47.4DSZ
398SSS
223TFC
395.2DAE
2SSS
2MMC
69.7TFC
373.8TFC
0AMH32 1239
149.2TFC
376.2TFC
225.4TFC
2DSZDEBRIS

Properties (7)

additional_info
630138030722202
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2022-03-08T03:43:07-08:00
documentation
PRO PIPE
is_lateral_inspection
false