Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 24, 2022, 08:48 AM
  • H 0887_H 0616_02242022_023612.mp4

Date
02/24/2022
W/O
936487
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00191
PipeID
P11035
Time
12:48 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9746
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
WEST PUENTE VALLEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_936487_TV15237_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0616
Downstream MH
H 0887
Dir. of Survey
Upstream
Length Surveyed
391.4 ft.
Total Length
391.4 ft.
Structural Index
3
Structural Quick
5D3O
Structural Rating
520
O&M Index
3
O&M Quick
3O2N
O&M Rating
388
Overall Index
3
Overall Quick
Overall Rating
908
Pipe schematic from manhole H 0616 to H 0887
MH: H 0616MH: H 0887upstream0 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - H 0887 ZOOMED IN0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3 ft. OBR - Obstacles Rocks, 15 %of cross sectional area, from 06 to 08 o'clock6.3 ft. B - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES6.3 ft. BSV - Broken Soil Visible, from 07 to 11 o'clock, within 8 inches of joint: YES28.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"53.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 12"78.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"102 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"120.1 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start127.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"150.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"175 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"200.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"223.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"248.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"272.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"297.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"320.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 8"345.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"387.4 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start389.4 ft. MGO - General Observation - 25% MAG COAT389.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start389.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start389.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start391.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE391.4 ft. MWM - Water Mark, 25 %of cross sectional area391.4 ft. MWL - Water Level, 20 %of cross sectional area391.4 ft. AMH - Downstream Manhole, Survey Begins - H 0616

Observation photos (8)

  • General Observation - 25% MAG COAT

    2 ft. - General Observation - 25% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Fine,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4 ft. - Deposits Settled Fine, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    271.3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 12"

    337.7 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 12"

  • Broken, from 09 to 12 o'clock, within 8 inches of joint: YES

    385.1 ft. - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Obstacles Rocks, 15 %of cross sectional area, from 06 to 08 o'clock

    388.4 ft. - Obstacles Rocks, 15 %of cross sectional area, from 06 to 08 o'clock

Observations (33)

DistanceCodeObservation
71.1TFC
388.4DSF
94.1TFC
4DSF
167.7TFC
191.2TFC
389DAGS
388.4OBR
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
45.5TFC
362.6TFC
385.1B
271.3SRV
385.1BSV
391.4SRV
2MGO25% MAG COAT
0MWM
0MWL
2SAP
391.4SSS
337.7TBA
240.7TFC
391.4AMHH 0887 ZOOMED IN
289.4TFC
391.4SAP
118.6TFC
0AMHH 0616
2DAGS
264.2TFC
2SSS
313.3TFC
216.4TFC
142.7TFC

Properties (7)

additional_info
630098022322202
custom_field_three
BROKEN PIPE,REINFORCEMENT VISIBLE
custom_field_two
1
customer
1
datetime
2022-02-24T00:48:11-08:00
documentation
PRO PIPE
is_lateral_inspection
false