Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 23, 2022, 06:30 AM
  • 01 0432_01 0431_02222022_234133.mp4

Date
02/22/2022
W/O
941344
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00208
PipeID
P00914
Time
10:30 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9880
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_941344_TV01248_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0432
Downstream MH
01 0431
Dir. of Survey
Downstream
Length Surveyed
155.5 ft.
Total Length
155.5 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 01 0432 to 01 0431
MH: 01 0432MH: 01 0431downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 04320 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start53.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"65.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"90.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"96 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"120.8 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start121.3 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"128.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"149.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish152.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish152.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish152.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish155.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0431155.5 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (6)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    120.8 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    155.5 ft. - General Observation - COCKROACHES IN MH

Observations (24)

DistanceCodeObservation
0AMH01 0432
120.8FL
121.3TFA
53.2TFC
0MGOCOCKROACHES IN MH
152.5FL
2DAGS
128.8TFC
155.5AMH01 0431
0MWL
2SSS
80.6TFC
106.5TFC
152.5SSS
65.6TF
152.5SAP
0MGOCONNECTION AT MH 3 O'CLOCK
2SAP
152.5DAGS
149.5TF
90.7TFC
155.5MGOCOCKROACHES IN MH
96TFC
0MWM

Properties (7)

additional_info
630138022222201
custom_field_three
FRACTURE/SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-02-22T22:30:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false