Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2022, 07:23 AM
  • 22 0466_22 0465_02092022_233811.mp4

Date
02/09/2022
W/O
936485
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00816
PipeID
P16804
Time
11:23 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9779
Sewer Name
22 LARK ELLEN TRUNK, SECTS 4,5,&6
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_936485_TV22049_FEB2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0466
Downstream MH
22 0465
Dir. of Survey
Downstream
Length Surveyed
266 ft.
Total Length
266 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
254
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
262
Pipe schematic from manhole 22 0466 to 22 0465
MH: 22 0466MH: 22 0465downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 04660 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. MGO - General Observation - MAG COATING2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"108.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"168.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"189.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"242.1 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start264.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish264.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish264.2 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish266 ft. AMH - Downstream Manhole, Survey Ends - 22 0465266 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
264.2SSS
266AMH22 0465
222.8TB
2MGOMAG COATING
0MWM
2SAP
189.2TFC
0AMH22 0466
264.2SAP
0MWL
266MGOCONNECTION AT MH 9 O'CLOCK
264.2DSC
21.3SSS
168.7TF
43.9TF
108.5TF
242.1DSC
0MGOCONNECTION AT MH 9 O'CLOCK
104.8TF

Properties (7)

additional_info
630098020922201
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-02-09T23:23:45-08:00
documentation
PROPIPE
is_lateral_inspection
false