Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 24, 2022, 09:28 PM
  • H 0478_H 0477_02242022_133614.mp4

Date
02/24/2022
W/O
936572
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00178
PipeID
P21378
Time
1:28 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9909
Sewer Name
H JOINT OUTFALL H - UNIT 5B
City
LA PUENTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_936572_TV15064_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
72 in.
Width
72 in.
Upstream MH
H 0478
Downstream MH
H 0477
Dir. of Survey
Downstream
Length Surveyed
118.3 ft.
Total Length
118.3 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole H 0478 to H 0477
MH: H 0478MH: H 0477downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 04770 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area3.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.3 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO, Start90.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"116.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish118.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish118.3 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish118.3 ft. AMH - Downstream Manhole, Survey Ends - H 0477 ZOOMED IN

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

    62.3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: NO, Start

Observations (11)

DistanceCodeObservation
118.3SAP
0AMHH 0477
62.3SRV
90.4TF
0MWL
116.1SSS
0MWM
118.3SRV
118.3AMHH 0477 ZOOMED IN
3.6SSS
3.6SAP

Properties (7)

additional_info
630138022422063
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE/SPALLIN
custom_field_two
2
customer
1
datetime
2022-02-24T13:28:50-08:00
documentation
PROPIPE
is_lateral_inspection
false