Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 24, 2022, 08:46 PM
  • H 0479_H 0478_02242022_132825.mp4

Date
02/24/2022
W/O
936572
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00178
PipeID
P10853
Time
12:46 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9909
Sewer Name
H JOINT OUTFALL H - UNIT 5B
City
LA PUENTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_936572_TV15064_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0479
Downstream MH
H 0478
Dir. of Survey
Downstream
Length Surveyed
679.7 ft.
Total Length
679.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0479 to H 0478
MH: H 0479MH: H 0478downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - EXTERNAL PIPE IN MH0 ft. AMH - Upstream Manhole, Survey Begins - H 04792 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"259.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"284.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"409.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"464.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"529.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"602.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"659 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"679.4 ft. AMH - Downstream Manhole, Survey Ends - H 0478679.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish679.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
679.6SSS
409.5TFC
464.7TFA
27.8TFA
659TF
0MGOCONNECTION AT MH 9 O'CLOCK
2SSS
0MGOCONNECTION AT MH 3 O'CLOCK
602.4TFA
0MWM
679.7SAP
0MWL
679.4AMHH 0478
0MGOEXTERNAL PIPE IN MH
284.2TFC
529.7TF
259.8TF
0AMHH 0479
2SAP

Properties (7)

additional_info
630138022422063
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2022-02-24T12:46:18-08:00
documentation
PROPIPE
is_lateral_inspection
false