Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 25, 2022, 06:14 AM
  • H 0476_H 0475_02242022_223011.mp4

Date
02/24/2022
W/O
936572
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00178
PipeID
P10852
Time
10:14 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9748
Sewer Name
H JOINT OUTFALL H - UNIT 5B
City
LA PUENTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
WO_936572_TV15064_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0476
Downstream MH
H 0475
Dir. of Survey
Downstream
Length Surveyed
380.2 ft.
Total Length
380.2 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
380
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
384
Pipe schematic from manhole H 0476 to H 0475
MH: H 0476MH: H 0475downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 04762 ft. MGO - General Observation - MAG COATING2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start82 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"141.4 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 8"241.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 8"264.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"289.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 8"331.3 ft. LR - Alignment Right, 30 %380.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.2 ft. MGO - General Observation - GIS MAPS CALL 383'380.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.2 ft. AMH - Downstream Manhole, Survey Ends - H 0475

Observation photos (7)

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"

    82 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 8"

    141.4 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 8"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"

    264.3 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"

  • Alignment Right, 30 %

    331.3 ft. - Alignment Right, 30 %

Observations (17)

DistanceCodeObservation
264.3TB
141.4TBA
82TF
380.2SSS
380.2MGOGIS MAPS CALL 383'
2.5SAP
331.3LR
0MGOCONNECTION AT MH 3 O'CLOCK
289.1TF
0MWM
380.2SAP
2MGOMAG COATING
2.7SSS
0MWL
241.1TFC
0AMHH 0476
380.2AMHH 0475

Properties (7)

additional_info
630098022422201
custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2022-02-24T22:14:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false