H 0476_H 0475_02242022_223011.mp4
2 ft. - General Observation - MAG COATING
2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
82 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"
141.4 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 8"
264.3 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"
331.3 ft. - Alignment Right, 30 %
| Distance | Code | Observation |
|---|---|---|
| 264.3 | TB | — |
| 141.4 | TBA | — |
| 82 | TF | — |
| 380.2 | SSS | — |
| 380.2 | MGO | GIS MAPS CALL 383' |
| 2.5 | SAP | — |
| 331.3 | LR | — |
| 0 | MGO | CONNECTION AT MH 3 O'CLOCK |
| 289.1 | TF | — |
| 0 | MWM | — |
| 380.2 | SAP | — |
| 2 | MGO | MAG COATING |
| 2.7 | SSS | — |
| 0 | MWL | — |
| 241.1 | TFC | — |
| 0 | AMH | H 0476 |
| 380.2 | AMH | H 0475 |