Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2022, 08:45 AM
  • J 0307_J 0306_02102022_005741.mp4

Date
02/10/2022
W/O
936476
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00059
PipeID
P11548
Time
12:45 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9730
Sewer Name
J JOINT OUTFALL J - UNIT 1G
City
RANCH PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
41
Purpose
Routine Assessment
Project
RFIR_WO_936476_TV05319_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
J 0307
Downstream MH
J 0306
Dir. of Survey
Downstream
Length Surveyed
337.6 ft.
Total Length
337.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole J 0307 to J 0306
MH: J 0307MH: J 0306downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - J 03070.9 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start337.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337.6 ft. AMH - Downstream Manhole, Survey Ends - J 0306337.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
337.6SAV
337.6AMHJ 0306
2MGOMAG COAT
0MWL
337.6SSS
0.9MWM
0AMHJ 0307
2SAV
2SSS

Properties (7)

additional_info
630074020922203
custom_field_three
SPALING, MAG COAT
custom_field_two
3
customer
1
datetime
2022-02-10T00:45:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false