Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2022, 07:37 AM
  • 05 2645_05 1849_02092022_234113.mp4

Date
02/09/2022
W/O
936817
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00494
PipeID
P07140
Time
11:37 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9728
Sewer Name
05 NORTH SLOPE CONNECTION TRUNK
City
LOMITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_936817_TV05266_FEB2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
21 in.
Upstream MH
05 2645
Downstream MH
05 1849
Dir. of Survey
Downstream
Length Surveyed
3.9 ft.
Total Length
3.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 05 2645 to 05 1849
MH: 05 2645MH: 05 1849downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 26450 ft. MWM - Water Mark, 50 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES3.9 ft. AMH - Downstream Manhole, Survey Ends - 05 1849

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
3.9AMH05 1849
2.1SAP
2.1SSS
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MWL
0AMH05 2645
0MWM

Properties (7)

additional_info
630074020922201
custom_field_three
Surface Aggregate Projecting
custom_field_two
3
customer
1
datetime
2022-02-09T23:37:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false