Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2021, 07:11 AM
  • 05 0148_05 0147_12272021_235948.mp4

Date
12/27/2021
W/O
926973
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05440
Time
11:11 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9573
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_926973_TV05147_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
15 in.
Upstream MH
05 0148
Downstream MH
05 0147
Dir. of Survey
Downstream
Length Surveyed
321.6 ft.
Total Length
321.6 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
192
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
192
Pipe schematic from manhole 05 0148 to 05 0147
MH: 05 0148MH: 05 0147downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01480 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.3 ft. MGO - General Observation - MAG COAT2.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start320.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0147

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0MWM
321.6AMH05 0147
2.3MGOMAG COAT
2.3SAV
320.1SAV
0MWL
0AMH05 0148
0MGOCONNECTION AT THE MH 9 OC'LOCK

Properties (7)

additional_info
630074122721202
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-12-27T23:11:03-08:00
documentation
PROPIPE
is_lateral_inspection
false