Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2021, 10:27 AM
  • 05 0166_05 2425_12282021_023339.mp4

Date
12/28/2021
W/O
926973
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P07559
Time
2:27 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9573
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_926973_TV05147_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
15 in.
Upstream MH
05 0166
Downstream MH
05 2425
Dir. of Survey
Downstream
Length Surveyed
35.1 ft.
Total Length
35.1 ft.
Structural Index
3
Structural Quick
3727
Structural Rating
35
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
35
Pipe schematic from manhole 05 0166 to 05 2425
MH: 05 0166MH: 05 2425downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MGO - General Observation - CONNECTION AT THE MH 6 OC'LOCK0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 01662.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish35.1 ft. AMH - Downstream Manhole, Survey Ends - 05 242535.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MGOCONNECTION AT THE MH 6 OC'LOCK
35.1SSS
0MGOCONNECTION AT THE MH 3 OC'LOCK
35.1AMH05 2425
2.3SSS
35.1SAP
0AMH05 0166
2.3SAP

Properties (7)

additional_info
630074122721202
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2021-12-28T02:27:52-08:00
documentation
PROPIPE
is_lateral_inspection
false