Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 22, 2021, 09:23 AM
  • 05 0102_05 0101_12222021_013557.mp4

Date
12/22/2021
W/O
926973
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05392
Time
1:23 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9568
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_926973_TV05147_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
24 in.
Upstream MH
05 0102
Downstream MH
05 0101
Dir. of Survey
Downstream
Length Surveyed
332.7 ft.
Total Length
332.7 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
195
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
195
Pipe schematic from manhole 05 0102 to 05 0101
MH: 05 0102MH: 05 0101downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01020 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK CAPPED4.2 ft. MGO - General Observation - MAG COAT4.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start105.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish105.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start329 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332.7 ft. AMH - Downstream Manhole, Survey Ends - 05 0101

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    105.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
4.2MGOMAG COAT
332.7AMH05 0101
0AMH05 0102
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWM
105.6SAV
4.2SAV
0MGOCONNECTION AT THE MH 9 OC'LOCK CAPPED
105.6SAP
329SAP

Properties (7)

additional_info
630074122121201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2021-12-22T01:23:00-08:00
documentation
PROPIPE
is_lateral_inspection
false