05 0128_05 0127_01182022_105953.mp4
0 ft. - General Observation - MAG COAT
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
21.9 ft. - Deposits Settled Fine, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start
40.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
264.2 ft. - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 12"
329.9 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 8"
| Distance | Code | Observation |
|---|---|---|
| 336.5 | SSS | — |
| 336.5 | SAV | — |
| 0 | MWM | — |
| 329.9 | TBA | — |
| 0 | AMH | 05 0128 |
| 264.2 | TB | — |
| 21.9 | DSF | — |
| 0 | MWL | — |
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 40.3 | SSS | — |
| 336.5 | AMH | 05 0127 |
| 2 | SAV | — |
| 0 | MGO | MAG COAT |
| 336.5 | DSF | — |