Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 18, 2022, 04:48 PM
  • 05 0125_05 0124_01182022_090222.mp4

Date
01/18/2022
W/O
926973
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00431
PipeID
P05415
Time
8:48 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9707
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_926973_TV05147_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
48 in.
Upstream MH
05 0125
Downstream MH
05 0124
Dir. of Survey
Downstream
Length Surveyed
163.6 ft.
Total Length
163.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 05 0125 to 05 0124
MH: 05 0125MH: 05 0124downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 01250 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. MGO - General Observation - MAG COAT162.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish162.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish163.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0124

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    4.2 ft. - General Observation - MAG COAT

Observations (10)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
4.2SSS
162.2SAV
0AMH05 0125
162.2SSS
163.6AMH05 0124
2SAV
4.2MGOMAG COAT
0MWM
0MWL

Properties (7)

additional_info
630138011822061
custom_field_three
AGGREGATE VISIBLE, SPALLING
custom_field_two
3
customer
1
datetime
2022-01-18T08:48:51-08:00
documentation
PROPIPE
is_lateral_inspection
false