Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 21, 2021, 08:12 AM
  • 05 0119_05 0118_12212021_002430.mp4

Date
12/21/2021
W/O
926973
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05409
Time
12:12 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9567
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
HAWTHRONE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_926973_TV05147_DEC2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
30 in.
Upstream MH
05 0119
Downstream MH
05 0118
Dir. of Survey
Downstream
Length Surveyed
317.6 ft.
Total Length
317.6 ft.
Structural Index
3
Structural Quick
513L
Structural Rating
292
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
292
Pipe schematic from manhole 05 0119 to 05 0118
MH: 05 0119MH: 05 0118downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01190 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area2.5 ft. MGO - General Observation - MAG COAT2.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start66.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish66.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start303.8 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES314.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK317.6 ft. AMH - Downstream Manhole, Survey Ends - 05 0118

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    66.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    67.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    303.8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (14)

DistanceCodeObservation
66.9SAP
2.5MGOMAG COAT
314.7SAP
0MWM
0AMH05 0119
2.9SAV
314.6SSS
303.8SRV
317.6AMH05 0118
67.4SSS
66.6SAV
0MGOCONNECTION AT THE MH 3 OC'LOCK
0MWL
317MGOCONNECTION AT THE MH 3 OC'LOCK

Properties (7)

additional_info
630074122021201
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2021-12-21T00:12:07-08:00
documentation
PROPIPE
is_lateral_inspection
false