Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 26, 2022, 06:54 AM
  • 08 0092_08 0091_01252022_230219.mp4

Date
01/25/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00120
Time
10:54 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9714
Sewer Name
08 MAIN STREET TRUNK
City
WILLOWBROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
8 in.
Upstream MH
08 0092
Downstream MH
08 0091
Dir. of Survey
Downstream
Length Surveyed
56.6 ft.
Total Length
56.6 ft.
Structural Index
2
Structural Quick
3A2A
Structural Rating
52
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
74
Pipe schematic from manhole 08 0092 to 08 0091
MH: 08 0092MH: 08 0091downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 08 00920 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES51.3 ft. RFB - Roots Fine Barrell, at 01 o'clock, within 8 inches of joint: NO54 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish54.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish54.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish56.6 ft. AMH - Downstream Manhole, Survey Ends - 08 0091

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    4 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Roots Fine Barrell, at 01 o'clock, within 8 inches of joint: NO

    51.3 ft. - Roots Fine Barrell, at 01 o'clock, within 8 inches of joint: NO

Observations (15)

DistanceCodeObservation
54SSS
0MWM
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2DAGS
51.3RFB
0MGOROACHES @ MH
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
4CL
0AMH08 0092
54.4CM
2CM
2SSS
0MWL
54.4DAGS
56.6AMH08 0091

Properties (7)

additional_info
630074012522201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-01-25T22:54:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false