Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2022, 10:19 AM
  • 08 0056_08 0055_02022022_023200.mp4

Date
02/02/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00058
Time
2:19 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9722
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
08 0056
Downstream MH
08 0055
Dir. of Survey
Downstream
Length Surveyed
262 ft.
Total Length
262 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
102
Overall Index
2
Overall Quick
Overall Rating
362
Pipe schematic from manhole 08 0056 to 08 0055
MH: 08 0056MH: 08 0055downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 08 00560 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - SHELF DAMAGED2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN98.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN145.9 ft. CS - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES158.5 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"216.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN258.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN259 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish259 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish261 ft. MGO - General Observation - ROACHES @ MH261 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN262 ft. AMH - Downstream Manhole, Survey Ends - 08 0055262 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • General Observation - SHELF  DAMAGED

    0 ft. - General Observation - SHELF DAMAGED

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

    145.9 ft. - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
262AMH08 0055
145.9CS
261MGOROACHES @ MH
0MWL
2DAGS
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
38.3TFOPEN
258.6TFOPEN
259SSS
216.4TFOPEN
261MGOCONN @ MH 3 O'CLOCK/UNKNOWN
262CM
0AMH08 0056
98.7TFOPEN
2CM
158.5TFA
259DAGS
0MWM
2SSS
0MGOSHELF DAMAGED

Properties (7)

additional_info
630074020122201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-02T02:19:57-08:00
documentation
PRO PIPE
is_lateral_inspection
false