Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2022, 10:45 AM
  • 08 0054_08 0053_02022022_030034.mp4

Date
02/02/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00056
Time
2:45 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9722
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
08 0054
Downstream MH
08 0053
Dir. of Survey
Downstream
Length Surveyed
299 ft.
Total Length
299 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
297
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
415
Pipe schematic from manhole 08 0054 to 08 0053
MH: 08 0054MH: 08 0053downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 08 00542 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES24.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"75.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"127 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"177.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"224.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"275.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"297 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish297 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish297.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299 ft. MGO - General Observation - ROACHES @ MH299 ft. AMH - Downstream Manhole, Survey Ends - 08 0053

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    4 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
0MGOROACHES @ MH
127TFC
297.3CM
2CM
0MWL
275.7TFC
224.7TFC
2SSS
177.3TFC
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
0MWM
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
2DAGS
4CS
297DAGS
297SSS
0AMH08 0054
75.5TFC
299MGOROACHES @ MH
299AMH08 0053
24.7TFC

Properties (7)

additional_info
630074020122201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-02T02:45:57-08:00
documentation
PRO PIPE
is_lateral_inspection
false