Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2022, 05:59 AM
  • 08 0050_08 0049_02022022_221334.mp4

Date
02/02/2022
W/O
931501
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00016
PipeID
P00052
Time
9:59 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9723
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_931501_TV08116_JAN2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
21 in.
Upstream MH
08 0050
Downstream MH
08 0049
Dir. of Survey
Downstream
Length Surveyed
313.4 ft.
Total Length
313.4 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
434
Pipe schematic from manhole 08 0050 to 08 0049
MH: 08 0050MH: 08 0049downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00502 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"70.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"121.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"172 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"222.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"273.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"310.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish311 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish313 ft. MGO - General Observation - ROACHES @ MH313.4 ft. AMH - Downstream Manhole, Survey Ends - 08 0049

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
22.6TFC
311SSS
2DAGS
310.7CM
311DAGS
0MWM
172TFC
0MWL
313MGOROACHES @ MH
273.9TFC
0AMH08 0050
2SSS
121.3TFC
313.4AMH08 0049
2CM
70.4TFC
222.8TFC

Properties (7)

additional_info
630074020222201
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-02-02T21:59:12-08:00
documentation
PRO PIPE
is_lateral_inspection
false